DIAGEO Approvisionnement Mondial Valleyfield

  • Location: Salaberry-de-Valleyfield, QC
  • Project description:

    Martin Roy et Associés has been mandated to perform the electrical engineering of a new bottling line. A new transformer on a 2300 V / 480 V - 1500 kVA voltage base has been installed outside. The 2300 V overhead line has been extended to the new transformer. A 3000 A - 480 V cabinet for the distribution of power to conveyors, compressors and the various machine panels was installed in an electrical room. Cable shelves for control and power cables have been installed along the entire length (about 70 m) of the bottling line. In addition, 35 motors and more than 70 control components on the bottling line were connected.