3 Independence Way

  • Location: Princeton, NJ
  • Scope: Energy modelling
  • Project description:

    Having many obsolete systems, the building was the target of a refurbishment and application of energy efficiency measures. By replacing its numerous fluorescent tubes with LED lighting. and the replacement of its roof units, the building was able to reduce its energy consumption by more than 35%.

Projects in the same category

To apply

The position you are looking for is not available?

Send us your CV. We are always looking for talent.